Diesel or the grid
The site buys power every day. The bill follows the fuel or the power price. A remote site depends on the next delivery.
GoSí Energy coordinates solar and battery plants that replace part of the diesel or grid power at remote mines. Own the plant, or provide the land and buy the power under a PPA (Land + PPA). Our EPC partners design, build and install it.
Remote mining
Mining operations face energy challenges of their own, especially in remote locations where grid power is unreliable or unavailable. GoSí Energy coordinates Battery Energy Storage System (BESS) and photovoltaic (PV) projects from feasibility to delivery. EPC partners design, build and install the plant, so the operation can keep running with less dependence on diesel generators.
The plants are specified for the demanding conditions of a mine: robust equipment for harsh sites, and energy-management software that allocates power to the way the operation actually runs.
Economics
The savings sheet shows an indicative result from the site’s own diesel or grid figures. It is not a quote. Open the savings model
The site buys power every day. The bill follows the fuel or the power price. A remote site depends on the next delivery.
Solar covers the day. The battery covers the night. Less diesel, or less power drawn from the grid.
BESS/PV
High-efficiency photovoltaic arrays designed to maximize energy capture even in challenging climates and remote locations, providing daytime power to operations and charging battery systems.
Industrial-grade battery systems with sophisticated thermal management and safety features, providing stable power during peak demand and nighttime operations.
Smart energy management platforms that seamlessly integrate with existing power infrastructure, optimizing energy use based on operational patterns and weather forecasts.
The client buys and owns the system. EPC partners design, build and install it. GoSí coordinates the project from feasibility to delivery.
The client provides the land. EPC partners design, build and install the plant, and the client buys the power under a PPA. GoSí coordinates the project.
Soil
GoSí BioTech is researching how mined land can return to productive use. The pilot uses C4 Pakchong grass and biochar, the same approach described on gosi.earth.
Pakchong 1, a published super-napier, is the grass in the pilot. It is grown on mined ground to build a plant cover and a biomass harvest.
Part of the harvest can be turned into biochar and returned to the soil. That stream is described with the pilot figures on gosi.earth.
The rest of the harvest is the digester case: BioCNG, and digestate spread back on the land. Those figures are labelled on gosi.earth.
Lifecycle
GoSí Energy looks at a mine from the power supply through to land restoration with GoSí BioTech. The two lines sit side by side.
A BESS/PV plant, designed and built by EPC partners, is the power line while a mine is operating. GoSí BioTech's research is the land line after operations. GoSí coordinates both conversations.
Power and land are the two lines a mining company can talk to GoSí about.
Who we are
GoSí Energy coordinates projects from feasibility to delivery. EPC partners design, build and install the plant. The team comes from mining and from renewable energy, and the work is to fit a project to the way a mine already runs.
Our name combines "Go" (representing forward momentum) and "Sí" (Spanish for "yes"), reflecting our positive approach to solving energy challenges and our commitment to making sustainable mining not just possible, but profitable.
The team speaks the language of the operation and of the plant. GoSí coordinates the project. The design, the build and the installation stay with the EPC partners.
Implementation
GoSí coordinates a site assessment with specialist partners. They review energy use, how the operation runs, and the conditions on site, and they set the baseline.
Our EPC partners develop a tailored BESS/PV system design, coordinated by GoSí.
EPC partners install the system in phases, with checks at each stage. GoSí coordinates the work from feasibility to delivery.
EPC partners connect the new plant to the power equipment already on site and tune it from operating data. GoSí coordinates that handover.
Through the project, GoSí stays in contact with the site team so the work is clear and the operation is interrupted as little as possible. A duration is not stated here, because it depends on the site and on the EPC partner's programme.
Notes on power for remote mines
How a remote mine cuts diesel with solar and batteries: what panels replace, what the battery adds, how to size it and how to pay for it.
Replacing diesel generators at a remote mine with solar and batteriesWhat three working gold mines show about solar, wind and batteries off the grid, and what a study for your own mine needs.
Solar and battery plants for remote gold minesWhat a battery does at a mine, power vs energy in plain words, and how to size it. Real cases: Agnew, Fekola, Bellevue.
Battery storage for mines: what the battery does, and how big it should bePartner
As the mining industry faces increasing pressure to reduce environmental impact and carbon emissions, partnering with GoSí Energy provides both immediate benefits and long-term advantages:
FAQ
The savings sheet takes the site’s own diesel or grid figures and shows an indicative result. It is not a quote. GoSí coordinates the project. EPC partners design, build and install. Open the savings model
The battery is sized to the hours the site must cover after the sun drops. The work model starts at 12 hours of night cover. Battery capacity, in kWh, is the average load times those hours, divided by 0.9 for the usable fraction of the battery.
Own and operate: the client buys and owns the system. Land + PPA: the client provides the land, EPC partners design, build and install the plant, and the client buys the power under a power purchase agreement. GoSí coordinates either path.
People
We’ve assembled a world-class, multidisciplinary team with deep domain expertise, hands-on execution capability, and a shared passion for turning degraded land into regenerative, profitable assets. This is the team that will make it happen.
Founder & CEO
With 18+ years in precious metals and mining, Guido is a recognized leader in ESG strategy and sustainable transformation. He advises major companies and governments on soil rejuvenation, forming the strategic backbone of GoSí.
Bio-engineer & Head of Regenerative Systems
Dean brings 20+ years of practical permaculture and regenerative agriculture experience across Europe and Central America. A pioneer in regenerative solutions, he designs and builds systems at scale, from water harvesting to controlled-environment agriculture.
Mark is a seasoned strategic business leader with over a decade of success in commodities innovation. He identifies untapped market opportunities, forges high-value partnerships, and transforms bold ideas into commercially viable, scalable realities for GoSí.
Mauro is a Mallorca-based operator with extensive experience in logistics, real estate, and business development. He leads stakeholder engagement, site acquisition, and project coordination, ensuring projects are grounded in reality and delivered efficiently.